यदि मैं भारत सरकार का हिस्सा होता तो राष्ट्र को ऊर्जा दक्ष बनाने के लिए मैं सबसे पहला कार्य क्या करता?

If I was the Government of India, what is the one thing that I would do to make the nation energy efficient?
आरंभ करने की तिथि :
Nov 03, 2014
अंतिम तिथि :
Dec 31, 2014
18:30 PM IST (GMT +5.30 Hrs)
प्रस्तुतियाँ समाप्त हो चुके

ऊर्जा संरक्षण के लिए भारत सरकार को सबसे पहले क्या करना चाहिए सुझाव ...

ऊर्जा संरक्षण के लिए भारत सरकार को सबसे पहले क्या करना चाहिए सुझाव दें।

इस कार्य के लिए प्राप्त हुई प्रविष्टियाँ
806
कुल
718
स्वीकृत
88
समीक्षाधीन
फिर से कायम कर देना
718 सबमिशन दिखा रहा है
MUNISH MITTAL
MUNISH MITTAL 11 साल 9 महीने पहले
As india has huge barren land & all year solar energy resource,if i was govt.,I gave my best to convert these barren lands into solar energy parks confining at least 10 solar power station (500MW) in each state. I would take contribution from people & NGOs for infrastructure. I would invest in geothermal energy in rajasthan & ladakh. I would also exploit biogas for power generation.Also SAARC electricity grid, nuclear power,Max. use of LED bulb, Ban on old bulbs,equal distribution of energy.
Ashwini Upadhyay
Ashwini Upadhyay 11 साल 9 महीने पहले
in india around 24% electricity is destroyed in testing process, (1)it is because the bad type of machinery we are using (2) Idea of power genration (3) inexperienced Staff in indian power copration.. if i am in a government i provide special package to buy advanced machinery for all states(2) increases FDI % in power production (3) and making one district as a power hub for his state ex up's power hub is Sonbhadra,(4) encouraging the people to save Energy like Swatch Bharat abhiyan..Jay HIND
PULKIT GUPTA
PULKIT GUPTA 11 साल 9 महीने पहले
We can work on road top solar panels on national highways, flyovers, foot over bridges, roadside footpaths and also over roof of Metro Stations in Delhi & Mumbai. As for our highways, currently India is having more than 92000 Kms. of Highways. As per experts, we get 1000 units or 1KW of energy in a day over 1sq.mt. of area. So, 1KW = 1sq.mt. 1000KW = 1MW = 1000sq.mt. = 1sq.km. 1000MW = 1000sq.km. 92000MW = 92000sq.km. 92000MW of electricity generation is the target of Indian govt.
Hemalatha Mathankumar
Hemalatha Mathankumar 11 साल 9 महीने पहले
I would frame a usage limit based upon the domestic, commercial and number of people using. If the usage limit raises, I would send a warning, again if it is raised, severe penalty and power disconnection would be done. Automatically there would be less usage considering the severe penalty. Only those who are affordable to pay the electricity bill and water bill are wasting our resources.
sunil apte
sunil apte 11 साल 9 महीने पहले
Sir i have been to Gujarat after earthquake seen many changes. Solar energy and everywhere was solar energy. This can bring a great change to India if all industries use Solar energy but its very costly, Please reduce the cost of solar plants for industries that can bring a great change in India. http://talkingpointsmemo.com/idealab/huge-thermal-plant-opens-as-solar-industry-grows